DEL SESTO BUILING
Johnson & Wales University
Providence Preservation Society
Award Winner
The university targeted the 1913 landmark
downtown building for massive renovations to suit the Department
of Information Technology and mandated that the existing Data Center
remain operational until the new Data Center could come on line.
The phased project included façade repairs, system and infrastructure
upgrades, and interior work for four of the building's seven floors.
The building had been chopped up into a jumble
of small offices, windows were blocked, and the window walls had
been problematic and failing for years. Through all phases Lamborghini/
Feibelman Ltd. led the consultant team through a comprehensive renovation
improving infrastructure, skin, and systems. The design includes
open floor plans, higher ceilings at the newly engineered window
walls, an elevator, and an accessible entrance on Weybosset Street.
|